HYUNDAI THE NEW PALISADE 3.8 GASOLINE 2WD PRESTIGE
Lot: SC-01M4D1S1DCRABTYVTFYFQR30JG
Ocena: A/C
Aukcja: 2026/10/21
53,696 km
sellcar























Specyfikacja:
- Accident grade:A
- Auction status:Entry Registration
- Body type:SUV
- Entry no:2118
- First registration:2022-07-28
- Imported:No
- Seats:7
- VIN:KMHR381EBPU507443
- Auction lane:B Lane
- Body repairs:Front Bumper: Repair Required; Rear Bumper: Repair Required; Side Mirror (Left): Exchange Required; Front Door (Left): Repair Required; Front Door (Right): Repair Required; Rear Door (Left): Repair Required; Rear Door (Right): Painting, Repair Required; Rear Fender (Left): Repair Required
- Color:White
- Exterior grade:C
- Fuel:Gasoline
- Inspection findings:Steering – Operational Status: Repair Required (Noise); Interior – Seats: Repair Required (Seat Failure, Contamination); Interior – Interior Trim / Upholstery: Repair Required (Upholstery Failure)
- Usage:Rental Car
Wyposażenie:
Dodano: 2026-10-19 07:45
Lot: SC-01M4D1S1DCRABTYVTFYFQR30JG
Data aukcji: 2026/10/21
Lot: SC-01M4D1S1DCRABTYVTFYFQR30JG
Ocena: A/C
Aukcja: 2026/10/21
53,696 km
sellcar
